ACI 318 Building CodeSurface Area: 720 Sq FtThickness: 4 Inches

How Much Concrete for a 24x30 Slab (4" Deep)?

Material takeoff and yardage calculator for a 24 ft × 30 ft concrete slab poured at 4 inches depth. Includes 10% safety margin for formwork deflection and subgrade settling.

Ready-Mix Order Volume (+10% Waste)
9.78 yd³(8.89 yd³ exact net)
Estimated Truck Delivery Cost: $1,320 - $1,614
Pre-Mixed Bags (Home Depot / Lowe's)
440 Bags80 lb Bags
Or 587 bags of 60 lb · Est. Bag Cost: $2,640 - $3,300

Excavation, Base & Reinforcement Specifications

Custom Volume Engine
Slab Footprint720 Sq Ft24 ft × 30 ft
Total Net Volume240 Cu Ft8.89 Cubic Yards
Compacted Gravel Base10.22 yd³4-inch #57 crushed stone
Pour RecommendationReady-Mix TruckToo large for hand mixing
Structural Reinforcement Specification:

#3 Rebar (3/8") or 6x6 W1.4/W1.4 welded wire mesh placed on 2" chairs

* Note: Ensure reinforcement chairs are used to keep rebar supported 1.5" to 2" above subbase. Do not lay steel directly on dirt.
Common Real-World Uses for this Size:
✓ Multi-Bay Workshop / Pole Barn✓ 4-inch structural pour✓ Residential Construction

Frequently Asked Concrete Questions

How many yards of concrete do I need for a 24x30 slab at 4 inches thick?

For a 24ft by 30ft slab poured at 4 inches deep, the exact net volume is 8.89 cubic yards (240.0 cubic feet). Always order with a 10% safety margin for subbase settling and form deflection, bringing your total order to 9.78 cubic yards.

How many bags of concrete does it take to pour a 24x30 slab?

If mixing by hand, you will need approximately 440 bags of 80lb concrete (or 587 bags of 60lb concrete) including 10% waste buffer. Because this exceeds 2.5 cubic yards, ordering ready-mix truck delivery is strongly recommended over mixing bags by hand.

Is 4 inches thick enough for a multi-bay workshop / pole barn?

Yes. A 4-inch slab is the residential building code standard for pedestrian patios, walkways, storage sheds, and standard passenger cars (under 6,000 lbs).

What gravel base and rebar reinforcement is needed?

Excavate 8 to 10 inches total. Install 10.22 cubic yards of crushed gravel (compacted to 4 inches). Support your #3 Rebar (3/8") or 6x6 W1.4/W1.4 welded wire mesh placed on 2" chairs so it sits in the middle third of the slab pour.