ACI 318 Building CodeSurface Area: 1200 Sq FtThickness: 4 Inches

How Much Concrete for a 30x40 Slab (4" Deep)?

Material takeoff and yardage calculator for a 30 ft × 40 ft concrete slab poured at 4 inches depth. Includes 10% safety margin for formwork deflection and subgrade settling.

Ready-Mix Order Volume (+10% Waste)
16.29 yd³(14.81 yd³ exact net)
Estimated Truck Delivery Cost: $2,199 - $2,688
Pre-Mixed Bags (Home Depot / Lowe's)
734 Bags80 lb Bags
Or 978 bags of 60 lb · Est. Bag Cost: $4,404 - $5,505

Excavation, Base & Reinforcement Specifications

Custom Volume Engine
Slab Footprint1200 Sq Ft30 ft × 40 ft
Total Net Volume400 Cu Ft14.81 Cubic Yards
Compacted Gravel Base17.04 yd³4-inch #57 crushed stone
Pour RecommendationReady-Mix TruckToo large for hand mixing
Structural Reinforcement Specification:

#3 Rebar (3/8") or 6x6 W1.4/W1.4 welded wire mesh placed on 2" chairs

* Note: Ensure reinforcement chairs are used to keep rebar supported 1.5" to 2" above subbase. Do not lay steel directly on dirt.
Common Real-World Uses for this Size:
✓ Commercial Barn / Industrial Slab✓ 4-inch structural pour✓ Residential Construction

Frequently Asked Concrete Questions

How many yards of concrete do I need for a 30x40 slab at 4 inches thick?

For a 30ft by 40ft slab poured at 4 inches deep, the exact net volume is 14.81 cubic yards (400.0 cubic feet). Always order with a 10% safety margin for subbase settling and form deflection, bringing your total order to 16.29 cubic yards.

How many bags of concrete does it take to pour a 30x40 slab?

If mixing by hand, you will need approximately 734 bags of 80lb concrete (or 978 bags of 60lb concrete) including 10% waste buffer. Because this exceeds 2.5 cubic yards, ordering ready-mix truck delivery is strongly recommended over mixing bags by hand.

Is 4 inches thick enough for a commercial barn / industrial slab?

Yes. A 4-inch slab is the residential building code standard for pedestrian patios, walkways, storage sheds, and standard passenger cars (under 6,000 lbs).

What gravel base and rebar reinforcement is needed?

Excavate 8 to 10 inches total. Install 17.04 cubic yards of crushed gravel (compacted to 4 inches). Support your #3 Rebar (3/8") or 6x6 W1.4/W1.4 welded wire mesh placed on 2" chairs so it sits in the middle third of the slab pour.

Related Concrete Slab Dimensions

View All 30 Slab Sizes